Corrective intervention for leaks detected in operation. Critical repair of Boiler 720-B-6 with immediate and high-precision technical response.
Supply of a senior Combustion Engineer during the critical phase of commissioning and optimization of the new steam generation system for the methanol production plant.
Major maintenance during plant shutdown: Boiler 720-B7 rehabilitation, gas line modifications and maintenance of over 40 specialized valves.
Preventive and minor corrective maintenance to ensure operational continuity through detailed inspection of critical components.
Complete rehabilitation of critical exchanger for operational continuity, executed in 24-hour regime for 60 days.
Emergency intervention in confined space for complete repair of refractory system and critical leak correction.
Complete rehabilitation of critical equipment for polypropylene production, executed at INCALCA external workshop.
Complete rehabilitation executed under 24-hour continuous work regime for 60 days meeting shutdown schedules.
100% internal mechanical cleaning of tubes to remove dust deposits and catalyst scale.
Major repair and mechanical integrity recovery of Dryer Compressor C exchanger in 15 days.
Major maintenance focused on complete recovery of steam generation equipment mechanical integrity.
Repair of wall tubes on Boiler 1301 at a hydrated alcohol production plant, completed to full client satisfaction.
Leak repair service on Boiler 720-B6 at the SuperMetanol plant, carried out with immediate technical response.
Repair of heat exchanger E3-353B at the Chlor-Alkali Plant in the Ana María Campos Petrochemical Complex.
Complete rehabilitation through retubing of heat exchanger 04E-201 at Ana María Campos Petrochemical Complex.
Repair of a thickness-loss area in Vessel D-210 with ASME stamping, restoring the asset's integrity.
Retubing of heat exchanger C-911B/E1 for PROPILVEN, restoring equipment efficiency at the polypropylene production plant.
Retubing of heat exchangers during the Olefins I Major Plant Shutdown at Ana María Campos Petrochemical Complex.
Retubing and hot-side tubesheet replacement in quenches for Furnace F-0301 at Olefins II Plant.
Retubing of heat exchanger 4E-114 at the Estireno Zulia Plant in El Tablazo Petrochemical Complex.
Industrial repair service for PROPILVEN equipment at the Ana María Campos Petrochemical Complex.
Fabrication of Oxy-Reactor R-201 distributor coils and retubing of heat exchanger E-701 at MVCII Plant, Ana María Campos Complex.
Replacement of tube bundles for exchangers 12-E-431, E-432 and E-433 and static equipment maintenance during FertiNitro's Train I, Urea and Granulation Plant Shutdown.
Repair of the tube bundle in heat exchanger 12-E-432 at FertiNitro's Ammonia Plant, performed with precision and meeting required timelines.
Specialized chemical cleaning of heat exchangers during FertiNitro's 2013 Plant Shutdown, removing deposits and scale.
Maintenance of heat exchangers, vessels, column and tanks during FertiNitro's Train II Plant Shutdown.
Retubing of five heat exchangers (6,362 tubes total) during MVCII Plant shutdown, delivered on time with additional award of exchanger E-513.
Preventive and corrective maintenance of the heat exchanger in FertiNitro's Train II Ammonia Plant, sustaining design parameters and maximum efficiency.
Retubing of heat exchangers E-2801 O-T at the Olefins II Plant of Ana María Campos Petrochemical Complex.
Complete fabrication of heat exchanger 200-E-23 for Super Octanos plant at José Antonio Anzoátegui Complex.
Retubing of heat exchanger EA-225 for POLINTER at the Ana María Campos Petrochemical Complex.
Emergency repair of heat exchanger E-310 at MVCII Plant in 6 continuous days, with installation of 1,158 new tubes.
Retubing of exchangers E-6103 and E-8903 A/B at the Olefins II Plant of Ana María Campos Petrochemical Complex.
Retubing of heat exchangers E-2802 A/B at Olefins II Plant, Ana María Campos Petrochemical Complex.
Retubing of 14 heat exchangers during the Olefins II 2011 Scheduled Shutdown, executed in record time to complete PEQUIVEN satisfaction.
Retubing of Preheater 1E-105 at Estireno Zulia Plant, El Tablazo Petrochemical Complex.
Retubing service for Boiler 720-B-7 at SuperMetanol's MTBE ISO-Octane Plant in José Antonio Anzoátegui Complex.
Major maintenance of heat exchangers, vessels and tanks in FertiNitro Trains I and II, executed to high quality and safety standards.
Full retubing of Super Octanos Boiler 720-B-6 with 100 workers in 45 continuous days, including refractory demolition and shell repairs.
Maintenance of exchanger TC-11 at Maratón Complex: cover removal, plug and gasket supply and installation, pipe installation and hydrostatic testing.
High-pressure hydrojet cleaning of exchangers 22-E-510, 22-E-422 and 22-E-423 at FertiNitro, eliminating obstructions and recovering thermal transfer.
High-precision mechanical hydrojet cleaning of exchanger 22-E-504 at FertiNitro, sanitizing exchange surfaces.
Retubing of the replacement tube bundle in heat exchanger 200-E-102 for Super Octanos at José Antonio Anzoátegui Complex.
Maintenance and repair of 50 heat exchangers (21,110 tubes) during the Olefins I Plant Shutdown, completed in 21 days without causing delays.
Retubing of the tube bundle in Heat Exchanger E-2503 belonging to the REP Unit at PDVSA's El Palito Refinery.
Cleaning of the heat exchanger in refrigeration package 18-L-160 at FertiNitro, restoring cooling capacity.
Structural repair of the tubesheet of exchanger 12-E-504 at FertiNitro, correcting wear and preventing cross-leaks.
Replacement of superheater tubes and expansion joints of boiler 32B-601 at FertiNitro, ensuring integrity at high temperature.
Retubing of boilers WH-3A/B during the Ammonia Plant Shutdown at Ana María Campos Complex, with ASME inspection supervision over 41 continuous days and zero accidents.