Welders qualified under ASME Section IX for high-integrity joints in carbon steel, stainless steel and special alloys.
In short: Welding on pressure equipment is not like conventional structural welding. A defective weld on a boiler, heat exchanger or pressure vessel can cause a catastrophic failure with fatal consequences. That is why the ASME Code requires that welding procedures (WPS) be qualified through documented mechanical tests (PQR) and that each welder demonstrates his competence through individual performance tests (WPQ).
Welding on pressure equipment is not like conventional structural welding. A defective weld on a boiler, heat exchanger or pressure vessel can cause a catastrophic failure with fatal consequences. That is why the ASME Code requires that welding procedures (WPS) be qualified through documented mechanical tests (PQR) and that each welder demonstrates his competence through individual performance tests (WPQ). INCALCA maintains qualified welding procedures (WPS/PQR) under ASME Section IX for all processes and materials required by the Venezuelan process industry.
INCALCA holds qualified WPS procedures for the main welding processes used in fabrication and repair of pressure equipment.
INCALCA works with all metallic materials used in pressure equipment in the Venezuelan industry.
INCALCA's entire welding qualification system complies with ASME Section IX requirements and is audited periodically by the Authorized Inspector.
Operating plants often require in-situ welding in difficult conditions. INCALCA has the experience and equipment for these conditions.